• Home
  • Shipmates
    • Member List
    • Ship Reunions
  • Forum
    • Discussion Forums
    • Departments Onboard
    • Latest Activity
  • Posts
  • Documents
    • Doc Files
    • Photos
    • Videos
  • Contact
    Sign in Sign up


    • Home
    • Shipmates
      • Member List
      • Ship Reunions
    • Forum
      • Discussion Forums
      • Departments Onboard
      • Latest Activity
    • Posts
    • Documents
      • Doc Files
      • Photos
      • Videos
    • Contact
    Sign in Sign up
    Group logo of Engineering

    Engineering

    Public Group

    Public Group

    Keeping the ship underway, Engineering maintained and operated the 2 nuclear reactors onboard that provided steam for propulsion and electrical power production as well as producing fresh water and operating the heating, air conditioning, ventilation, hot water and sewage system.

    Organizer (1)

    Organized by
    • Profile photo of Gomez
    • Feed
    • Members 2
    • Photos
    • Videos
    • Albums
    • Documents

    Requesting the group members. Please wait.

    USS Long Beach CGN-9 Strike Hard - Strike Home
    © 2022 - USS Long Beach CGN-9

    Report

    Block Member?

    Please confirm you want to block this member.

    You will no longer be able to:

    • See blocked member's posts
    • Mention this member in posts
    • Invite this member to groups
    • Message this member
    • Add this member as a connection

    Please note: This action will also remove this member from your connections and send a report to the site admin. Please allow a few minutes for this process to complete.

    Report

    You have already reported this
    Clear Clear All